Jun 5, 2024
Berardi+ is grateful to have partnered with the K&D Group on the revitalization of the 55 Public Square. A once underutilized office space has been reimagined into a mixed-use building featuring 202 luxury apartments, renovated amenities, and office spaces in the...
Dec 26, 2018
Berardi completed all architecture and engineering planning for the historic Hanna building, transforming this 8-story structure, through an adaptive re-use plan, to provide 102 contemporary residential dwelling units. The site is ideally located in the heart of...
Dec 26, 2018
The East Ohio Building, originally known as the Tishman Building, was constructed in 1959. The 21 story building at its time of construction was the second tallest building constructed in Cleveland post-depression, quickly becoming an element of historical...
Dec 26, 2018
The reconstructed Columbus YWCA includes the historic redevelopment and adaptive reuse of the eight-story Griswold Building. Redevelopment includes 90 dwelling units consisting of 60 one-bedroom and 30 efficiency units. Units are located within a portion of the second...
Dec 26, 2018
As one of the original large shopping venues in the heart of downtown Cleveland, The Halle Building was originally constructed as a rigid frame concrete building in several phases, including the last phase providing a 500 car parking structure. The principal Halle...